Home » News » P 10 pre-cabins delivered to CPU hydrogen power generation project in Northern China with final user as Goldwin.

P 10 pre-cabins delivered to CPU hydrogen power generation project in Northern China with final user as Goldwin.

Views: 0     Author: Site Editor     Publish Time: 2023-08-18      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
sharethis sharing button
P 10 pre-cabins delivered to CPU hydrogen power generation project in Northern China with final user as Goldwin.

图片4

18th, Aug., 2023, 10 units of customized containers for hydrogen power generation equipment delivered to CPU Hydrogen Power Technology Co., Ltd., with final application in East Northen of China which will be put into operation in Jan., 2024.


Hyswell (Yangzhou) Integration Technology Co., Ltd. is located in Economic Zone, South of Yangzhou, Jiangsu, China.

Product Category

Quick Links

Contact Us

Copyright © 2024 Hyswell (Yangzhou) Integration Technology Co., Ltd.All Rights Reserved. | Sitemap  |  Technology by leadong.com   苏ICP备2024061545号-1